Real-world Results for Lean in Healthcare

Profero helps Implement Lean in Hospitals



Specific examples from Profero healthcare clients

 

  • Anatomic Pathology Lab - freed up 40% of the space in an storeroom by applying 5S and visual controls, reduced the amount of inventory carried, eliminated expired product, increased the number of deliveries per week
  • Phlebotomists - reduced errors in specimen draw mistakes by over 80% by appling standard work and batch size reduction
  • Laboratory - Reduced the average time per requisition from 3 minutes, 52 seconds to 1 minute 28 seconds and reduced training time from 9-12 weeks to 4-6 weeks by using streamlined layout, standard work and batch size reduction
  • Eight Full Time Employees (FTEs) were freed up over a one year lean implementation and were redeployed in understaffed areas
  • Nurse recruiting -  by using Value Stream Mapping the nurse recruitment process lead-time was cut by 50%
  • Resource planning – reduced the average time for capital requests from over three months to 30 days or less
  • At one location we trained over 250 managers and employees in basic Lean Healthcare concepts in a hands-on, interactive seminar. Raised the awareness and importance of Lean Healthcare. This provided the basis for cultural shift required to implement Lean and prepare personnel for improvement changes.

Profero's & 5S Supply's

Social Media Connections

5S Supply Blog

blog.5Ssupply.com

Follow our tweets at

Twitter.com/5Ssupply

"Like" us on Face Book facebook.com/5Ssupply

"How to" videos and more

YouTube.com/5Ssupply

Contact Us

For answers to your questions or to schedule an appointment, please call:


815-469-5678

 

Or send us an email info@proferoinc.com or a message

Upcoming Events

Check back soon!

Print Print | Sitemap
© Profero 2012